La
For years has been present on the plant design market with focus on the design of renewable energy solutions. Over time, this has become a reality in the sector, aiming to optimise development processes; design, engineering and energy consultancy adapted to specific residential and industrial needs.
Design
We design and manage the facilities
for energy production
from renewable sources.
Requalification
We plan to upgrade energy saving measures in the residential, tertiary and industrial sectors.
Diagnosis
We carry out energy audits through professionals in the sector, aimed at establishing the use of renewable sources.
Our collaborators
The Protentia team, experts with different expertise, combined with a shared vision that believes in innovation and sustainability.
Energy
Goal 1
year 2030
EU strategy and legislation for the 2030 environment, energy and climate targets.
Reduce the greenhouse effect by 50 %.
Next deadline
year 2050
The European Union’s objective by 2050 is Decarbonisation, so time is short; with STR Renovable Study you are in good hands.
Economically viable, reliable and incentivised solutions.
Services
Benefits of saving energy
Integrated energy design
Contain energy costs (energy requalification, NZEB buildings) including energy audit and certification.
Tax deduction practices
Implementation and management of tax deductions and thermal accounts.
Thermographic checks
To prevent problems that directly affect production processes.
Design of photovoltaic installations
Design and operation of photovoltaic plants from renewable sources.
Connection questions
Are you a designer or installer? Visit our platform for practices management
or call us at + 39 3454703124
The latest projects
How we work
An expert will reply to your questions
FAQ
We will answer your questions and with the help of the industry expert we will clarify your questions and give you the best guarantees in the field of energy.
Find the most frequent asked questions here.
Do you have questions? info@strprogetti.com
When is the plant design mandatory?
The plant design is always mandatory!
Both in the case of a new installation and in the case of maintenance or conversion of an existing installation. It may be drawn up by an authorised self-employed person or by the technical manager of the installer as appropriate, but may never be omitted.
When is the ex L10 report mandatory?
Every time a change is made which leads to energy savings (e.g. Boiler change, installation of new frames, construction of solar thermal or photovoltaic systems).
What incentives are foreseen for taking energy saving measures?
Tax deduction is currently foreseen in 10 years at a rate of 65 % for the replacement of heat generators with heat pumps and hybrid systems, solar thermal installations and heat pump water heaters. The deduction is also allowed for the replacement of boilers to GAS at a rate of 50 % if no modified thermoregulation system is provided and 65 % if the latter is present.
Photovoltaic installations on residential buildings can still benefit from the 50 % deduction (building renovation) in 10 years.
Experts in the field
Team
Qualified people to qualify the country. The firm is formed by a team of experts who boast 360° experience and professionalism.
Mario Storti
Founder – Industrial expertRoberto Storti
Owner – Industrial expertAlessandra Giacobini
SurveyorCaterina Fiornoni
EngineerStefano Garosio
Industrial expertMichele Pelli
EngineerPuppi Gabriele
EngineerKatiuscia Alberganti
Administrative employeeI was entrusted to the Roberto Storti Renewable Study. Their seriousness and reliability are their success.
Maria Della Vedova
InstallerI wanted to install photovoltaic panels to produce energy and therefore contacted many design studies. In the end, I found my personal capacity and innovation in the study.
Jackson Brown
CustomerI needed a platform to manage the practices with customers and installers. I have trusted ‘connection questions’ where I have everything I need on a single platform